Caption:Engineers decided this 147 metre long flood damaged bridge on the Heaphy Track couldn’t be repaired.Photo credit:Supplied / Department of ConservationRepairs underway on an area of the Milford Track damaged by floods in early 2020.RNZ / Tess Brunton